Shahed University
Step change point estimation in the multivariate-attribute process variability using artificial neural networks and maximum likelihood estimation
Mohammad Reza Maleki | Amirhossein Amiri | Seyed Meysam Mousavi
URL :
http://research.shahed.ac.ir/WSR/WebPages/Report/PaperView.aspx?PaperID=31041
Date :
2015/10/26
Publish in :
Journal of Industrial Engineering International
DOI :
https://doi.org/10.1007/s40092-015-0117-7
Link :
http://link.springer.com/article/10.1007/s40092-015-0117-7?wt_mc=internal.event.1.SEM.ArticleAuthorAssignedToIssue
Keywords :
Point, Multivariate-attribute, Variability, Networks, Maximum, Likelihood
Abstract :
Authors' Home page
Amirhossein Amiri
Seyed Meysam Mousavi